WT282 Ammonia Storage & Dosing

Client
ENELPOWER
Owner
ETA POWER PLANT
Location
CUTRO (KR) – Italy
Scope of work
Turn-key
Year of completion
2002
Status
Delivered

KEY STAFF

Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer I. Izzo
Quality Controller A. Trezzi

PROCESS

Fluid 25% NH3 solution
Total Capacity 185 lt/h
Number of tanks 1 x 30 m3
Filling system By gravity into intermediate pump – By pumps into main tank
Means of dosing 2 x 100% metering pumps
Access platforms Yes, at upper siphon level
Safety devices Complete safety set specifically suited for the plant
Storage Material / Lining Carbon steel – Venting system in stainless steel

Notes:

Vent sealing by water siphon.
All connection welded for safety reasons.

Download files connected with the Project

For any further information whatsoever contact: swsinfo@swsonweb.com