WT-060 Deferr

Client
ABB Sadelmi
Owner
Cinergy S.A.
Location
Ivory Coast
Scope of work
Design and Supply
Year of completion
1999
Status
In operation

KEY STAFF

Project Director M. Rognoni
Project Manager M. Rognoni/A. Trezzi
Process Manager B. Granata
Chief Designer A. Trezzi
Quality Controller A. Trezzi

PROCESS

Water to be treated Raw Water
Total Capacity 90 m3/h
Number of lines 1 x 100%
Guaranteed TDS Iron content reduced up to 0,2 ppm
Material of Tubes Carbon Steel
Material of Vessel Carbon Steel Epoxy Coated
Spray System Type valves type SW3 (installed N.5)

Notes:

Plant delivered in 3 months in accordance with contractual schedule.
Process based on air oxidation enhanced by MnO2 catalyst.

Download files connected with the Project

For any further information whatsoever contact: swsinfo@swsonweb.com