Client
BARC
Owner
BARC
Location
Trombay—India
Scope of work
Turn-key
Year of completion
2005
Status
Delivered
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer A. Trezzi
Quality Controller D. Quaranta
PROCESS
Water to be treatedTotal Design Capacity 50 t/d
Number of units 1×100%
Guaranteed TDS 0.5 ppm achieved either with SED
Process Arrangement MVC (Mech. Compressor by Piller) two effects
Tubes material Titanium
Shell material AISI 316L Stainless steel
Tubes fixing Rubber grommets
Top Brine Temperature 65°C
Notes:
Distillate guarantee 0.5 ppm ensured by SED
One spare set of Al 5052 tubes are supplied for alternative test run.
Energy absorption = 8.5 kW/ton
Download files connected with the Project
For any further information whatsoever contact: swsinfo@swsonweb.com