Client
ENELPOWER
Owner
ENEL
Location
PIETRAFITTA – Italy
Scope of work
Turn-key
Year of completion
2003
Status
Delivered
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer F. Ferrari
Quality Controller M. Serpieri
PROCESS
Water to be treated Condensate at HP 30 bar
Total Capacity 400 m3/h
Number of lines 1 x 100%
Guaranteed SS < 2 μ
Process Arrangement Cartridge Filter
Cartridges Arrangement N. 120, each 2” x 48”, made of P.P.
Backwash By air impulse, controlled by PLC
Filters Material / Lining A 516 gr. 70. Internally rubber lined Thk 4 mm / Externally epoxy painted 250 µ
Notes:
Innovative process scheme, basic designed by ENEL and engineered by SWS
Plant entirely skidded and wired at site