Client
PETKIM
Owner
PETKIM
Location
Aliaga (Turkey)
Scope of work
Design and Supply
Year of completion
2003
Status
In operation
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager L. Izzo
Chief Designer F. Volpe
Quality Controller A. Trezzi
PROCESS
Water to be treated Cooling Water Flow
Total Design Capacity 24.000 m3/h (total 5 cells in Tower G and 3 cells in Tower H)
Cooling towers Forced draft (by HAMON)
Filtration Sand filters—Side stream installation
pH control H2SO4
Chemical additivation Chemical dosing skids
Biological treatment Gas chlorine
Pumps Vertical centrifugal tot. N. 8
Electrical equipment Substation, transformers and MCC for MT and BT
Notes:
Contract value exceeding 6.8 M€.
Site assistance services included during erection, commissioning and start up.
Download files connected with the Project
Download files connected with the Project
For any further information whatsoever contact: swsinfo@swsonweb.com