WT-029 Vasilikos

Client
Austrian Energy & Env.
Owner
El. Authority of Cyprus
Location
Vasilikos – Cyprus
Scope of work
Design and Supply
Year of completion
1998
Status
In operation

KEY STAFF

Project Director M. Rognoni
Project Manager L. Meli
Process Manager L. Izzo
Chief Designer L. Izzo
Quality Controller L. Meli / A. Trezzi

PROCESS

Water to be treated Desalinated Water
Total Capacity 40 m3/h
Number of lines 2 x 100%
Guaranteed TDS 0,1 ppm
Process Arrangement Mixed Bed Filters
Resins Type Rohm & Haas Amberlite 252Na – IRA 900Cl
Regeneration System Counter flow
Regenerants Type Caustic Soda 40% / HCl 98%
Filters Material / Lining C.S. Internally rubber lined Thk 4 mm / Externally epoxy painted 250 mm

Notes:

Plant delivered in 8 months in accordance with contractual schedule.
Site services performed for commissioning / start-up.

Download files connected with the Project

WT-029 Vasilikos
210.pdf (99 KB)

For any further information whatsoever contact: swsinfo@swsonweb.com