TA-421

Client
ENELPOWER
Owner
RAS LAFFAN POWER COMPANY LIMITED
Location
Qatar
Scope of work
Design and Supply
Year of completion
2003
Status
Delivered

KEY STAFF

Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager D. Bonicelli
Chief Designer D. Bonicelli
Quality Controller D. Quaranta

PROCESS

Water to be treated Condensate and Make up water from MSF
Total Capacity 1670 t/h
Number of units 2 x 50%
Guaranteed O2 content 0,005 ppm
Process Arrangement Spray and Trays thermal deaerator
Design pressure 4 bar abs/Full Vacuum
Design temperature 250°C
Materials Shell and heads in A 516 gr 70

Notes:

Design of spray valves and trays by SWS. Trays mod. WTA.
Tower arranged horizontally connected to the tank with 1 downcomer + 4 steam balancing nozzles.
Constructed in OLMAR workshop (Italy)