Client
EDF (CNET)
Owner
EDF– ELECTRICITE DE FRANCE
Location
JARRY SUD
Scope of work
Turn-key
Year of completion
2004
Status
In operation
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A.Trezzi
Chief Designer A.Trezzi
Quality Controller D.Quaranta
PROCESS
Water to be treated Desalinated Water
Total Design Capacity 10.5 t/h
Number of lines N.3 EDI Cells
Guaranteed TDS 0,1 µ 5/cm
Process Arrangement Water feed from buffer tank at distiller outlet
Resins Type Stacks by E-Cells
Regeneration System Continous by electrodes
Regenerants Type 10 kW
Filters Material / Lining Preassembly in container.
Notes:
Plant delivered as auxiliary item to the MVC desalination plant supplied bt SWS