Client
NOOTER ERIKSEN
Owner
FISIA
Location
Qatar
Scope of work
Design and Supply
Year of completion
2006
Status
Delivered
KEY STAFF
Project Director P. Lucchi
Project Manager D. Bonicelli
Process Manager A. Spada
Chief Designer P. Bulleri
Quality Controller SWS&GB
PROCESS
Water to be treated Condensate + Demi Water
Total Capacity 915 t/h each unit
Number of units 2
Guaranteed O2 content 0,007 ppm
Process Arrangement Spray and Trays deaerator
Design pressure 9.5 bar abs/Full Vacuum
Design temperature 180 °C
Materials Deaerating tower : SA516Gr.70 Storage Tank: SA516Gr.70 Internals SS316L
Notes:
Design of spray valves and trays by SWS. Trays mod. WTA for enhanced water flow.
Tower arranged horizontally connected to the tank with 1 downcomer + 4 balancers.
Fabrication made in the workshop of GB Eng. (India).
Download files connected with the Project
For any further information whatsoever contact: swsinfo@swsonweb.com