Client
SNAMPROGETTI
Owner
AGIP GAS BV
Location
Mellitah—LIBYA
Scope of work
Design and Supply
Year of completion
2004
Status
Delivered
KEY STAFF
Project Director P. Lucchi
Project Manager R. Minzoni
Process Manager D. Bonicelli
Chief Designer D. Bonicelli
Quality Controller D. Quaranta
PROCESS
Water to be treated Condensate + Demi
Total Design Capacity 1670 t/h each unit
Number of units 2
Guaranteed TDS 0,005 ppm
Process Arrangement Spray and Trays thermal deaerator
Design pressure 5.5 bar abs/Full Vacuum
Design temperature 240 °C
Materials Deaerating tower : A 516 gr. 70 Internals AISI 304 L (trays + valves AISI 316L)
Notes:
Design of spray valves and trays by SWS. Trays mod. WTA for enhanced water flow.
Tower arranged horizontally connected to the tank with 1 downcomer + 4 nozzles.
Download files connected with the Project