Client
COMMISSIONING
Owner
ELETTRA (Lucchini Group)
Location
Piombino—Italy
Scope of work
Design and Supply
Year of completion
2001
Status
Delivered
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager F. Volpe
Chief Designer L. Gaudio
Quality Controller M. Serpieri
PROCESS
Water to be treated Effluents from the Power Plant
Total Design Capacity 50 m3/h
Number of lines N. 1 deoiling + 2 x 100% neutralization basin
Guaranteed According to Italian law (D.L. 152/99)
Process Deoiling Turbo Steel Plates (self cleaning CPI)
Pumps Vertical centrifugal
Basins Concrete epoxy painted
Location Outdoor
Notes:
The deoiling unit is equipped with the new patented Turbo Steel Plates in AISI 316L for the enhanced deoiling capacity and the steam flushing during operation.