Client
ALSTOM
Owner
EDISON
Location
Candela—ITALY
Scope of work
Design and Supply
Year of completion
2004
Status
Delivered
KEY STAFF
Project Director M. Rognoni
Project Manager R. Minzoni
Process Manager D. Bonicelli
Chief Designer D. Bonicelli
Quality Controller D. Quaranta
PROCESS
Water to be treated Condensate + Make up
Total Capacity 480 t/h each unit
Number of units 1
Guaranteed O2 content 0,005 ppm
Process Arrangement Spray and Trays thermal deaerator
Design pressure 9 bar abs/Full Vacuum
Design temperature 180 °C
Materials Deaerating tower : A 516 gr. 70 Internals AISI 316L
Notes:
Design of spray valves and trays by SWS. Trays mod. WTA for enhanced water flow.
Tower arranged horizontally connected to the tank with 1 downcomer + 4 nozzles.
Template supplied for connection check.
Download files connected with the Project
For any further information whatsoever contact: swsinfo@swsonweb.com