Client
FERTALGE
Owner
FERTALGE
Location
Arzew—ALGERIA
Scope of work
Design and Supply
Year of completion
2005
Status
Delivered
KEY STAFF
Project Director P. Lucchi
Project Manager P. Lucchi
Process Manager D. Bonicelli
Chief Designer D. Bonicelli
Quality Controller D. Quaranta
PROCESS
Water to be treated Condensate + Demi
Total Capacity 105 t/h
Number of units 1
Guaranteed O2 content 0,007 ppm
Process Arrangement Spray and Trays thermal deaerator
Design pressure 4.5 bar abs/Full Vacuum
Design temperature 250 °C
Materials Deaerating tower : solid 316 L Internals (trays + valves AISI 316L) Tank: 516GR70
Notes:
Design of spray valves and trays by SWS. Trays mod. WTA .
Tower arranged connected to the tank with 1 downcomer + 4 nozzles.
Download files connected with the Project
For any further information whatsoever contact: swsinfo@swsonweb.com