21-635 Gasco

Client
SNAMPROGETTI
Owner
GASCO
Location
Ruwais (UAE)
Scope of work
Design and Supply
Year of completion
2007
Status
Delivered

KEY STAFF

Project Director P. Lucchi
Project Manager E. Biglietto
Process Manager A. Spada
Chief Designer F.Rossi
Quality Controller G. Ardizzoia

PROCESS

Water to be treated Demi Water
Total Capacity 26 t/h
Number of units 1
Guaranteed O2 content 0,020 ppm
Process Arrangement Spray filling&Trays Vacuum stripping with N2 injection deaerator
Design pressure Full Vacuum
Design temperature 85 °C
Materials
Deaerating tower : SS316L
Storage Tank: SA516Gr.70
Internals SS316L

Notes:

Design of spray valves and trays by SWS. Trays mod. WTA for enhanced water flow.
Fully pre-assembled package supplied with vacuum system, water pumps, I&C panel.

Download files connected with the Project

21-635 Gasco
526.pdf (99 KB)

For any further information whatsoever contact: swsinfo@swsonweb.com