21-548 TORVISCOSA

Client
ALSTOM
Owner
EDISON
Location
Torviscosa—ITALY
Scope of work
Design and Supply
Year of completion
2004
Status
Delivered

KEY STAFF

Project Director M Rognoni
Project Manager R. Minzoni
Process Manager D. Bonicelli
Chief Designer D. Bonicelli
Quality Controller D. Quaranta

PROCESS

Water to be treated Condensate + Make up
Total Capacity 480 t/h each unit
Number of units 2
Guaranteed O2 content 0,005 ppm
Process Arrangement Spray and Trays thermal deaerator
Design pressure 9 bar abs/Full Vacuum
Design temperature 180 °C
Materials Deaerating tower : A 516 gr. 70 Internals AISI 316L

Notes:

Design of spray valves and trays by SWS. Trays mod. WTA for enhanced water flow.
Tower arranged horizontally connected to the tank with 1 downcomer + 4 nozzles.
Template supplied for connection check.

Download files connected with the Project

For any further information whatsoever contact: swsinfo@swsonweb.com