WT158 Chemical

Client
LINDE A. G.
Owner
Jilin Chemical Ind. Group
Location
JILIN – China
Scope of work
Design and Supply
Year of completion
2002
Status
Delivered

KEY STAFF

Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer I. Izzo
Quality Controller A. Trezzi

PROCESS

Water to be treated Regeneration water to Polishers
Total Capacity 2 x 2 m³
Number of tanks 2
Stirrer Yes
Means of Suction Water eductors
Access Platforms None
Chemical Type Caustic Soda 40% / HCl 33%
Storage Material / Lining A 516 gr. 70. Internally rubber lined Thk 4 mm / Externally epoxy painted 250 µ

Notes:

Plant delivered in 8 months in accordance with contractual schedule.
Design ambient temperature –45 °C