Client
ASTRA for Enelpower/Ansaldo
Owner
HICKSON & WELCH
Location
Yorkshire – U.K.
Scope of work
Design and Supply
Year of completion
2000
Status
Delivered
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer P. Lucchi
Quality Controller A. Trezzi
PROCESS
Water to be treated Make up demineralized water
Total Capacity 78 m3/h
Number of unit 1 x 100%
Guaranteed O2 content 0,005 ppm
Process Arrangement Spray and Trays Vacuum deaerator
Design pressure Full Vacuum
Design temperature 24 °C
Materials Deaerating tower: AISI 316 L
Notes:
Equipment delivered in 6 months in accordance with contractual schedule.
Design of spray valves and splashing trays by SWS.
Download files connected with the Project