Client
EDF – CNET
Owner
EDF
Location
Jarry Sud – Guadalupe
Scope of work
Turn-key
Year of completion
2004
Status
Delivered
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer A. Trezzi
Quality Controller D. Quaranta
PROESS
Water to be treated Sea water
Total Design Capacity 250 t/d
Number of units 1×100%
Guaranteed TDS 0.5 ppm achieved either with SED or with EDI
Process Arrangement MVC (Mech. Compressor by Piller)Single effect
Tubes material Titanium
Shell material AISI 316L Stainless steel
Tubes fixing Rubber grommets
Top Brine Temperature 65°C
Notes:
Distillate guarantee 0.5 ppm ensured by SED
The supply includes 1×100% EDI (cells by E-cells) as spare
Download files connected with the Project
For any further information whatsoever contact: swsinfo@swsonweb.com