WT-076 Servola

Client
Servola S.p.A.
Owner
LUCCHINI
Location
Trieste Steel Factory
Scope of work
Turn-key
Year of completion
2002
Status
In operation

KEY STAFF

Project Director M. Rognoni
Project Manager M. Rognoni
Process Manager L. Izzo
Chief Designer L. Izzo
Quality Controller A. Trezzi

PROCESS

Water to be treated Filtered Water
Total Design Capacity 60 t/h
Number of lines 2×50% Cationic+ 1×100% dearb.+2×50% Anionic+2×50% mixed beds
Guaranteed TDS (*) 0,1 ppm
Resins Type Rohm & Haas Amberjet 1200 H – 4200 Cl
Regeneration System Counter Flow
Regenerants Type (*) NaOH 40% + HCl 35%
Filters Material / Lining SA 516 Gr. 70 rubber lined thk 4 mm

Notes:

Plant delivered in 5 months in accordance with contractual schedule
The two new lines are specifically programmed to work in shifts with the two existing lines.

Download files connected with the Project

For any further information whatsoever contact: swsinfo@swsonweb.com