Client
ENELPOWER
Owner
DEWA
Location
JEBEL ALI Stn. K-Dubai
Scope of work
Design and Supply
Year of completion
2003
Status
In operation
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager L. Izzo
Chief Designer F. Volpe
Quality Controller A. Trezzi
PROCESS
Water to be treated Desalinated water
Total Capacity 200 t/h
Number of lines 3 x 50%
Guaranteed TDS 0,05 ppm
Process Arrangement Mixed Bed Filters
Resins Type Purolite C 100 MBH – A 400 MBCL
Regenerants Type Caustic Soda 40% / HCl 33%
Filters Material / Lining A 516 gr. 70. Internally rubber lined Thk 4 mm / Externally primarized only
Notes:
Scope of supply including Soda preparation, chemical storage, regeneration and neutralization systems.
Plant fully prefabricated and skidded.
Download files connected with the Project