WT-305 Gas Chlorination System

Client
PETKIM
Owner
PETKIM
Location
Aliaga (Turkey)
Scope of work
Design and Supply
Year of completion
2003
Status
Delivered

KEY STAFF

Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager L. Izzo
Chief Designer F. Volpe
Quality Controller A. Trezzi

PROCESS

Water to be treated Cooling water
Total Design Capacity 18.000 m3/h water
Capacity 200 kg/h max.
Chlorination Gas chlorine injection
Chlorine storage Bottles: N. 1 x 1000 kg
Control system By PLC (program by SWS)
Chlorine evaporator Included
Dosing procedure 15 min. shock/day
Chlorination equipment Vacuum system by ALLDOS